The purpose of the project is to build utility units and ancillary services, provide the necessary supplies for process units and office, industrial and residential buildings such as water, electricity, steam, air, nitrogen, etc. The list of utility units required by the plan as determined during feasibility studies will include and not be limited to the following. It is noted that during the phases of conceptual studies or basic engineering, estimates of utility uses, capacity, type, arrangement or layout of their equipment may undergo changes.
>> Steam generation and distribution unit
>> Compressed air production and distribution unit
>> Nitrogen production and distribution unit
>> Industrial and non-industrial water production and distribution
>> network Water cooling distribution network, DM water, etc …
>> Fire Water Network
>> Steam collection network and return condensation
>> Cassette manufacturing and distribution unit
>> Industrial and sanitary sewage recycling network
>> Liquid and gas fuel distribution network
>> Torch gas collection network (Flaring Network)
>> Network of communication lines between different petrol refinery units and communication roads
>> Industrial and non-industrial buildings
>> Surface water collection network
>> Construction of warehouses and workshops
>> Construction of food and produce tanks
>> Other (telecommunications, F&G wireless, CCTV, one)